Hi Syed
When no PV is found with selection method 3, no production orders or process orders can be created. I assume the same is true for the planned orders?.
System terminates the production order/Process order creation when selection method 3 and no valid PV.
When planned order generation system will generate planned order for FG material only and it won't generates the planned orders for further level of main material BOM components.
- When no valid PV is found when selection method 2 is set, what happens?
- Is the planned order created with no bom / recipe selected?
- If planned order is created, can it be converted?
System creates the production order/Process order by the information message " No valid production version found for material" when selection method 2 and no valid PV.
When planned order generation system will generate planned order for FG material and BOM components as well.
While converting system converts the planned order to production order by above same message.
Regards
Kesava